P-1/P+1 Testing Status

Overall Progress
13269
Composites with P-1
13.5% of 97972 composites
9158
Composites with P+1
9.3% of 97972 composites
9158
Both P-1 and P+1
9.3% of 97972 composites
84703
No P-1/P+1 Yet
86.5% remaining
Total Curves: P-1: 13,650 | P+1: 27,513
Filter Composites
Clear Filters
Composites P-1/P+1 Coverage

Showing 1 to 200 of 97972 composites

Click column headers to sort. Click composite ID to view details.

ID Digits Target T Required B1 P-1 Status P+1 Status P1 Coverage
#104091 54 t17 50,000 1 curve @ B1=50,000 3 curves @ B1=50,000 Complete
#114005 56 t17 50,000 1 curve @ B1=50,000 3 curves @ B1=250,000 Complete
#115668 66 t20 250,000 1 curve @ B1=250,000 3 curves @ B1=250,000 Complete
#110635 66 t20 250,000 1 curve @ B1=250,000 3 curves @ B1=250,000 Complete
#105642 74 t23 250,000 1 curve @ B1=250,000 3 curves @ B1=250,000 Complete
#112328 74 t23 250,000 1 curve @ B1=250,000 3 curves @ B1=250,000 Complete
#139522 78 t24 250,000 1 curve @ B1=250,000 Not done P-1 Only
#139528 80 t25 250,000 1 curve @ B1=250,000 Not done P-1 Only
#139454 88 t27 1,000,000 1 curve @ B1=1,000,000 Not done P-1 Only
#128316 88 t27 1,000,000 Not done Not done None
#134644 92 t28 1,000,000 Not done Not done None
#135016 96 t30 1,000,000 1 curve @ B1=1,000,000 Not done P-1 Only
#136479 97 t30 1,000,000 Not done Not done None
#120336 100 t31 3,000,000 1 curve @ B1=3,000,000 3 curves @ B1=3,000,000 Complete
#139515 101 t31 3,000,000 1 curve @ B1=3,000,000 Not done P-1 Only
#139526 104 t32 3,000,000 1 curve @ B1=3,000,000 Not done P-1 Only
#139519 104 t32 3,000,000 Not done Not done None
#139050 104 t32 3,000,000 1 curve @ B1=43,000,000 Not done P-1 Only
#139525 105 t32 3,000,000 1 curve @ B1=3,000,000 Not done P-1 Only
#137155 107 t33 3,000,000 1 curve @ B1=3,000,000 Not done P-1 Only
#139466 107 t33 3,000,000 1 curve @ B1=3,000,000 Not done P-1 Only
#139504 108 t33 3,000,000 1 curve @ B1=3,000,000 Not done P-1 Only
#139497 108 t33 3,000,000 1 curve @ B1=3,000,000 Not done P-1 Only
#120958 109 t34 3,000,000 1 curve @ B1=3,000,000 3 curves @ B1=3,000,000 Complete
#120950 110 t34 3,000,000 1 curve @ B1=3,000,000 3 curves @ B1=3,000,000 Complete
#139495 111 t34 3,000,000 1 curve @ B1=3,000,000 Not done P-1 Only
#139481 113 t35 3,000,000 1 curve @ B1=3,000,000 Not done P-1 Only
#20768 115 t35 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#136739 116 t36 11,000,000 Not done Not done None
#136738 119 t37 11,000,000 Not done Not done None
#19135 144 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18694 149 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19060 145 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19061 145 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19079 145 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17282 166 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99837 155 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17522 163 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#118103 124 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17493 164 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#16939 170 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99779 145 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18492 152 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99827 153 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18411 153 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18340 154 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17649 162 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17861 159 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18049 157 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99901 165 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18471 152 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19745 137 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#139501 124 t38 11,000,000 1 curve @ B1=11,000,000 Not done P-1 Only
#18037 157 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#16875 171 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17451 164 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19090 145 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17658 162 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#139492 124 t38 11,000,000 1 curve @ B1=11,000,000 Not done P-1 Only
#18893 147 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19670 138 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19225 143 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19258 143 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99871 160 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19271 143 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19040 145 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18868 147 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19604 139 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19901 135 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18501 152 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18152 156 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19386 142 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17741 161 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19929 135 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#16799 172 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19124 144 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19909 135 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20003 134 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19467 140 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18864 147 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19168 144 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19143 144 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19035 146 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17487 164 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18960 146 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20231 131 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18530 151 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18592 151 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19100 145 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20110 132 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18816 148 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20050 133 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#16682 173 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17292 166 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20146 132 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20023 134 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20019 134 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17330 166 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18104 156 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17806 160 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#16794 172 t38 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99867 160 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17316 166 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19560 139 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18444 152 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18521 151 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19955 134 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20014 134 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18306 154 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20071 133 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17242 166 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19565 139 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19342 142 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19306 142 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19082 145 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20228 131 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17554 163 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19283 143 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18932 147 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19753 137 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18247 155 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17300 166 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17632 162 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18782 148 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19634 139 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19683 138 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17644 162 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18837 148 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17507 164 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18489 152 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17916 159 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17960 158 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19998 134 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19159 144 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19435 141 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19307 142 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19803 137 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#16697 173 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19856 136 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19788 137 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18074 157 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18839 148 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17479 164 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17240 166 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#16803 172 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19431 141 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19903 135 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#16655 174 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17211 167 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17810 160 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17971 158 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#16607 174 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19432 141 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18442 152 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18871 147 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18728 149 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17605 162 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17952 158 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17321 166 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18288 154 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17058 169 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#139457 127 t39 11,000,000 1 curve @ B1=11,000,000 Not done P-1 Only
#18006 158 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17677 161 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99767 142 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99756 141 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19705 138 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99747 139 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99843 155 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18626 150 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99840 155 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18451 152 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#99961 178 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18813 148 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#16982 170 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17444 164 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18347 153 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19024 146 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19336 142 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18494 152 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17217 167 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18869 147 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19960 134 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19957 134 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17388 165 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#16434 176 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#18454 152 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17516 163 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19441 141 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17580 163 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17267 166 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17961 158 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#17073 169 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19777 137 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20207 131 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19948 134 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19206 144 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#19052 145 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20109 132 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
#20113 132 t39 11,000,000 1 curve @ B1=11,000,000 3 curves @ B1=11,000,000 Complete
Page 1 of 490 (1-200 of 97972 composites)